Such a small excavator! But Fillipe was a digging artist. The batter board in the foreground is one of eight, carefully placed and leveled to mark where the house is to be. Fillipe is digging to that target. |
Still digging the second day. |
A mountain appeared beside the house location. Kids and dogs loved it. |
Digging complete, contractors spread peewee gravel for a 6 inch base. The white line you can see in the corner is a perimeter drain. |